Craneable Scaffold

Craneable Scaffold
Bespoke Design Works
Project Description

AEG was requested to provide a scaffold that could be utilised by rope access teams to install signage atop a high-rise building.

The scaffold was assembled 42 floors below and craned in and out of place by the site tower crane.

The scaffold supported a monorail on a cantilever to enable the installation works.